Anhui grassroots flood-warning system

Background

In September 2016, the General Office of the Anhui Provincial Government issued the Three-Year Action Plan for Accelerating Post-Disaster Water Conservancy Restoration and Constructive Treatment of Weak Links in Anhui, fully launching post-disaster water conservancy restoration and constructive treatment of weak links, of which an important item is rural grassroots flood forecast and warning. In May 2017, the Ministry of Water Resources, the National Development and Reform Commission, and the Ministry of Finance issued the Implementation Plan for Accelerating Construction of Post-Disaster Water Conservancy Weak Links, specifying Anhui’s investment scale and specific projects and arranging 57 counties (cities and districts) in Anhui to carry out rural grassroots flood forecast and warning system construction.

Sugon Solution

Given the project’s characteristics and local conditions, Sugon recommended the C500 micro data-center module and the C1000 row-level data-center module to help local flood forecast and warning systems be built quickly. The Sugon C500 system uses in-row circulating cooling dedicated to IT equipment cooling, effectively resolving high-density cooling bottlenecks, lowering equipment-room PUE, saving energy, and reducing dependence on the equipment-room environment. In addition, the C5000 system has an intelligent power-distribution management module and rich monitoring-management modules that can be unified under the Sugon management software platform, achieving intelligent integrated control of equipment-room infrastructure and IT systems.

The C1000 refrigerant-cooled cabinet integrated facility is an equipment-room infrastructure product independently developed and produced by Sugon, drawing on years of experience in national large-scale high-performance computing system centers. It introduces overseas technology with independent innovation. Sugon provides original-factory domestic production and after-sales service. Compared with other brands of imported cabinet-integrated equipment, it has a large price advantage and high cost-performance. Equipment lead time is one month, two-thirds shorter than the customs lead time of imported brands.

Customer Benefits

1. Provide customers with comprehensive, complete flood-prevention alarm and forecast;

2. In-depth analysis of flood-prevention information meets the accuracy needed for future flood warning;

3. Controllable inference and forecast of floods and other natural geological disasters reduce local losses from natural disasters;

4. Establish a sample project for local flood-prevention construction and promote the spread and application of local flood-prevention construction.